- Finish the collector Vicente Villada,
in Cd. Nezahualcoyotl, Mexico State. for
the installation of 710.00 meters of concrete reinforced
pipe 83cm diameter,using sunk pipe method with hidromechanic
push o and excavation with revolvable mechanic shield, and
light-shaft construction using az machiembrado profile,
executed from July 21th to september 30th 1998,
works subcontracted for Tehimex, CORP. of C.V.
- Construction
of 700.00 mts. of pluvial colector “Nuevo Laredo”,
in the location of Tulpetlac, borough of Ecatepec, Edo.
de México
Whit pipes of reinforced concrete of 2.13 mts. of diameter
by sinked method of pipes hidromechanic shove and digge
with mecanic shield of open front of lattire and digger,
and construction of luminary to profile base AZ tongue and
groove to public works direction of borough of Ecatepec,
through asociation agreement in colaboration with Contratista
National Company, S.A. de C.V.
- Construction of 167.00 mts.
pluvial Colector “Nuevo Laredo”, in the location
of Tulpetlac, borough of Ecatepec , Edo. de México.
Whit reinforced concrete pipes of 2.13 mts. of diameter
fon sinked melhod by hidromechanic shove and digge whit
mecanic shield of open front of lattire and construction
of tongue and goove to profile base AZ to public works direction
of borough of Ecatepec, by sub agreement whith Contratistas
Unidos Mexicanos, S.A. de C.V.
|