YEAR 1999



  • Contract work to raised price nr. 8-c05-2-043, for: integral project: studies, design, project and construction of the deviation 97.0 meters of the collector 2.44 diameter meters located to a depth among 5.00 and 7.00 meters induced by the construction of the metropolitan line nbn Buenavista-Ecatepec, for the Distrito Federal Government conduit of General Management Construction, Collective Transport System, for a period of execution from October 30th 1998 to March 1999,(d.g.c.o.s. t.c. ing. Leopoldo Plain Almaguer, director of civil work, tel 01-5-688-4443). This work settled the pipe using sunk of pipe method and hidromechanic push and excavation with mechanic shield, closed front grills and floodgates for vertical depression,. and light-draft construction with the help of az machiembrado profile.

  • Work Construction of collector San Javier River, located in the Parque de los Niños street and Deportes Av. Las Arboledase, Atizapan Municipality by contract to unitary price nr. sj/salp-003-99bis taken place with Services of Drinkable Water Organism f , Sewer system and Reparation of Atizapán. (s.a.p.a.s.a.) installing concrete reinforced pipe of 2.44 m. of 0,183 m. of 0, 152 m. of 0 with a total distance of 142 m. using pipe sunk method and hidromechanis push and excavation with mechanic shield with closed front grills and floodgates of vertical depression., and light-shaft construction with az machiembrado profile, with an execution period from June 30th 1999 to August 30th 1999.


  • Construction of the tunnel of 220 cm (86") diameter,using concrete reinforced pipe sunk 183 cm nominal diameter with hidro-mechanic push, with a longitude of 606 mt and light-shaft construction with machiembrado profile, for collector in San José Tláhuac with an execution period from August 09th to December 07th 1999.

  • Crossing Construction using sunk concrete reinforced pipe for Mexico - Pachuca Freeway from the toll hut, 0 1.83 m, in a distance of100 m,using the method of sunk pipe with hidro-mechanic push and excavation with mechanbic shield front open grills, and light-shaft construción with machiembrado profile, subcontract with Contratistas Unidos Mexicanos, CORP. of C.V., (at' n. ing. José Luis Bonilla Obregon, general manager tel 01-5-260 - 8121).

  • Cross of the bridge in Gómez's River pier and Blvd. Lopez Mateos. Works carried out for drinkable water and sewer system of León.

  • Reinstatement of the line of conduction of drinkable water of steel of 914 mm (36") of diameter of the prey Abelardo L. Rodríguez to the plant potabilizadora, replacing it with pipe of polyethylene termofusionado of 762 mm (30") of diameter in a longitude of 1420 ml; by means of the method of pipe explosion and light construction with the help of profile az machimbrado, in a longitude of 1420 ml; in the Municipality of Tijuana, B.C.

  • Construction indeco 11 collector with a longitude of 1,543.83 mts. of 2.44 mts.interior and reception in the light-shaft 5 of the semi-deep collector on Iztapalapa of this city.With sunk pipe method with hidro-mechanic push and excavation with mechanic front shield open grills, and light-shaft construction with machiembrado profile.


  • sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation