YEAR 2003

  • Construction of the 0.38, 2.13 and 2.44 M diameter CTM_ARAGON collector, Section III, of 352.00, 346.0 and .50 M in length respectively throughout the tunneling system, in addition to auxiliary and complementary projects in the Gustavo A Madero Delegation (Local Government Building), Mexico D.F. Projects carried out for the Mexico City Water System, Planning and Construction Department.
  • Construction of a 1,140.32 M section of the National Interceptor Channel spanning from access port 4 to access port 4A – Chalco Channel, with a 2.44M finished diameter, using a technique known as Pipejacking (also known as pipe driving), utilizing a 2.44M diameter closed front Hydroelectric Mechanical Shield situated along the Eje 3 Oriente, starting in Calz. De la Virgins and ending in Calz. De las Bombas, in the delegation of Coyoacan. The project was done for the Mexico City Water System.
  • Rehabilitation of the Tijuana sanitary culvert system in the North Zone (1st Section), with a length of 7,230 m, replacing it with 20cm (8"), 25cm (10"), 30cm ("), 40cm(16"), and 50cm (20") diameter fused high density polyethylene piping, utilizing the “burst lining” method. Work carried out for the Tijuana Public Works State Commission


sewerage, shields, pipe, tunnels, microtunnels, sheet piling, tube, driving, openings, recondition, drainage, thrust, cofferdams, collector, drilling, excavation